
Coming December 2026
Curlew
A new chapter by the water.
Sleeps 42 en-suite bedroomsHot tub plannedParking60 seconds to the beach
Watch it take shape
Something lovely.
In the making.
We're getting Curlew ready for its next chapter, with an opening planned for December 2026. A place for four, moments from the beach and at the heart of village life.
For now, here is a look behind the scenes: the work as it happens, and the proposed layout. These are build photographs, with finished interiors still to come.
From the drawing board
The proposed layout.
Architect’s proposed plans, July 2025. The intended layout, showing two en-suite bedrooms, living spaces, a hot tub and parking. Final details may evolve during the works.

Behind the scenes
Taking shape.
Coming December 2026
Be part of
the next chapter.
Email Amy and Nick about Curlew’s opening and future stays.
Enquire about Curlew



